Site icon KT's Slow Closet

Queue Check — August 2016

Queue Check — August 2016

My phase of serial monogamy seems to have officially ended. It was nice while it lasted, but now instead of completing any knitting projects, I just keep casting on new ones! There are currently five sweaters and two hats on my needles. One sweater and both hats are officially registered with Wool Protective Services as orphans at this point, but that leaves four active sweaters:

1) The black Linen Quill cardigan is the longest I’ve ever taken to complete a simple top-down sweater. In my defense, other sweaters with hard deadlines have pulled me away from it. But this continues to be the sweater I most urgently need. So in Stockinette Situations for the foreseeable future, this is the one I’ll reach for.
Current status: body is complete and one sleeve barely started; needs sleeves, pocket and button band

2) The purple Lettlopi pullover that was the basis of the new Improv pattern and revised tutorial would be the quickest one to finish, and it would be nice to have a photo to post and something to cross off! But it’s the least pressing in terms of being even remotely wearable, much less needed. Motivation will come blowing in around Thanksgiving.
Current status: body nearly complete; needs a second sleeve, another pass at whipstitching the neckband down, and some seams

3) The long-awaited Channel Cardigan in Clever Camel is finally on the needles! This is the one I simply want the most desperately — and I can’t stop fantasizing about somehow having it for my travels in early October — but I know it’s going to be a long road and I’ll have to be patient.
Current status: just half of one sleeve, with a dropped ply in the fisherman’s rib to be dealt with

4) My Top-Down Knitalong sweater in Shibui Pebble is a joy to knit and I know I’ll absolutely love wearing it, but I expect to be working on it for awhile!
Current status: yoke is just past the neck join, long ways to go

On the sewing front, rather than making those 5 things I said I wanted to complete before summer ends, I apparently decided to make 3 of 1 thing! I’ll post those FOs soon, but the other 4 pieces remain in the queue!

.

PREVIOUSLY in Queue Check: July 2016

Exit mobile version